Road Construction Halted On State Roads For Holiday

The N.C. Department of Transportation is making it easier for motorists to reach their Thanksgiving destination.

A statement from the department says most construction projects along interstate, North Carolina and U.S. routes are suspended now through 9 a.m., Monday, Dec. 2,

There are four exceptions. U.S. 1 just north of Aberdeen is reduced to one lane in each direction for new bridge construction. U.S. 158 in Elizabeth City is reduced to one lane in each direction over the Pasquotank River for resurfacing and new bridge construction.

U.S. 13 is closed north of Windsor for replacement of the bridge over the Cashie River, and Interstate 73 in Greensboro is reduced to two lanes in each direction between I-40 and I-85 to build a new interchange with High Point Road.

(Copyright 2013 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.)


Comments are posted from viewers like you and do not always reflect the views of this station.
powered by Disqus
WITN

275 E. Arlington Blvd. Greenville, NC 27858 252-439-7777
Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 233651931 - witn.com/a?a=233651931
Gray Television, Inc.