Highway 70 Bypass Workshop Invites Community Input

At a Department of Transportation workshop in Kinston Tuesday night, residents got a look at the latest options for a Highway 70 bypass. Project officials say earlier this year public opinion was split pretty evenly between redoing the existing route from Dover to La Grange in Lenoir County, taking a northern route around Kinston, or going around on the south side. Any decision will potentially impact traffic, businesses and homes.

"I'll be dead and gone by the time it happens, but even if I weren't I feel positive about it because I really think there needs to be publicity that there's a very positive side to this. That it's not loss we should be thinking about, but what we're going to be gaining," said Lenoir County Resident Carmena Zimmerman.

Engineers plan to come back with a narrowed selection of options by March next year. The decision on which route to take is expected in 2014. Actual construction of the project is not likely for at least another decade. Another workshop is scheduled for Thursday 4-7p.m. at the Public Services Complex on U.S. 258 South in Kinston. Residents can stop by anytime during the workshop.


You must be logged in to post comments.

Username:
Password (case sensitive):
Remember Me:

Read Comments

Comments are posted from viewers like you and do not always reflect the views of this station.
  • by tired of the pollution on Sep 21, 2011 at 05:47 AM
    I sure hope that NCDOT follows their complete streets policy and included sidewalks and bike lanes along this route so that we can wean ourselves off of foreign oil and promote healthier ways of transportation.
  • by Citizen Location: Lenoir County on Sep 20, 2011 at 07:58 PM
    I beg you fellow citizens, write to NCDOT and tell them that the Northern route or a modified existing route makes the most sense. When the GTP was proposed they promised to build the infrastructure to support it. They still havent done it. Without it it will never succeed. Build the promised northern route first for jobs. Build the Southern one to take jobs away from lenoir county.
  • by G on Sep 20, 2011 at 07:39 PM
    I vote north side, this will help traffic from the N (i.e. Greenville) bypass Kinston.
WITN

275 E. Arlington Blvd. Greenville, NC 27858 252-439-7777
Copyright © 2002-2016 - Designed by Gray Digital Media - Powered by Clickability 130243858 - witn.com/a?a=130243858
Gray Television, Inc.