Get Ready to Slow Down and Breath

Some of you will have to become a lot more patient. The swing bridge to Onslow Beach is scheduled for painting from October 6th through November 11th. During that time, motorists will be limited to one lane from 9 a.m. until 11 p.m., and the bridge will be closed from 11 p.m. until 9 a.m. Officials say the bridge is painted nearly every ten years to help protect it from the elements. It was last painted in 1997.


WITN

275 E. Arlington Blvd. Greenville, NC 27858 252-439-7777
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 1671586 - witn.com/a?a=1671586