Construction Wraps Up At Firetower/Portertown Intersection

After a two-and-a-half month detour, Firetower Road at the intersection of Portertown Road in Greenville is back open.

Construction wrapped up late Wednesday afternoon.

The intersection had been closed so the Department of Transportation could install a round-about.


You must be logged in to post comments.

Username:
Password (case sensitive):
Remember Me:
WITN

275 E. Arlington Blvd. Greenville, NC 27858 252-439-7777
Copyright © 2002-2016 - Designed by Gray Digital Media - Powered by Clickability 168707246 - witn.com/a?a=168707246
Gray Television, Inc.