Railroad Crossing Scheduled To Open

Greenville officials say Thursday is the day 14th Street is scheduled to re-open at the railroad crossing along Beatty Street.

Work on a railroad connector to cut down on long wait times at railroad crossings forced the closure of this portion of 14th St. The crossing closed in February, and the re-opening in mid-March was delayed by bad weather.


Comments are posted from viewers like you and do not always reflect the views of this station.
powered by Disqus
WITN

275 E. Arlington Blvd. Greenville, NC 27858 252-439-7777
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 89669787 - witn.com/a?a=89669787