TRAFFIC ALERT: Drawbridge Re-Opens To Traffic In New Bern

A stuck drawbridge, that was closed to traffic for most of Monday afternoon, is now re-opened to vehicles.

The Alfred Cunningham Bridge in New Bern was stuck open around 1:00 p.m. The bridge crosses the Trent River in downtown New Bern.

The D.O.T. says an electrical issue caused the problem, parts were replaced, and the bridge was opening and closing just fine.

The bridge re-opened to traffic around 4:25 p.m.


Comments are posted from viewers like you and do not always reflect the views of this station.
powered by Disqus
WITN

275 E. Arlington Blvd. Greenville, NC 27858 252-439-7777
Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 233334721 - witn.com/a?a=233334721
Gray Television, Inc.