Beaufort Co. Wind Turbine Project Could Survive By Moving Some Turbines

It appears a plan to build a wind turbine field in Beaufort County might be allowed to move forward.

Representatives from Beaufort County met with a Defense Department representative to determine any impacts a wind turbine field may have on military operations. The project has come under scrutiny because of its close proximity to the Dare County bombing range.

The project may be allowed to proceed after a number of the turbines are relocated.


You must be logged in to post comments.

Username:
Password (case sensitive):
Remember Me:
WITN

275 E. Arlington Blvd. Greenville, NC 27858 252-439-7777
Copyright © 2002-2016 - Designed by Gray Digital Media - Powered by Clickability 190966951 - witn.com/a?a=190966951
Gray Television, Inc.